ALBUQUERQUE RADON — REAL ESTATE RADON TIMELINE WORKSHEET Work backward from your inspection deadline. MY DATES Inspection / due diligence deadline: ____________ Closing date: ____________ Days remaining: ____________ TYPICAL SEQUENCE (BUSINESS DAYS) Day 0 Test placed (closed-house conditions begin 12 hours earlier) Day 2 Test retrieved; result available same day with a continuous monitor Day 3 If elevated: diagnostic visit (sub-slab communication testing) Day 3-4 Written proposal issued Day 5-7 Installation (most homes: one day) Day 8 System has run 24 hours; post-mitigation test placed Day 10 Post-mitigation result and documentation delivered MINIMUM REALISTIC WINDOW: about 10 business days from first test to verified result. Start earlier if the deadline is tight. NEGOTIATION NOTES - Who pays: ____________ - Agreed target level: ____________ pCi/L - Post-mitigation test required in writing? Y / N - Documentation to be delivered at closing: ____________ TIPS - Test as early in the contract period as possible - Ask for the pre- and post-mitigation reports, the system design, and the fan spec - A system installed without a post-test is not a completed remedy Placeholder document — review before distribution.