Roughing in a radon system before the slab is poured costs a fraction of retrofitting one later, and it makes activation a one-hour job if a post-occupancy test comes back high.

What the problem is

New homes are not inherently low-radon. Tighter building envelopes actually reduce natural air exchange, so soil gas that enters has less opportunity to dilute. The difference with new construction is opportunity: while the ground is open and the slab is unpoured, the entire soil-gas pathway can be controlled for a small fraction of what a retrofit costs.

How to know if you need it

  • You are building anywhere in New Mexico, where geology commonly produces elevated results.
  • Neighboring homes or the subdivision have tested high.
  • You are building a home with a basement or a walk-out lower level.
  • You want the option to activate a system later without cutting a finished slab.

The five features of a radon-resistant build

  1. 1Gas-permeable layer: 4 inches of clean, coarse aggregate beneath the slab so soil gas can move to a single collection point.
  2. 2Vapor retarder: heavy polyethylene sheeting over the aggregate, seams lapped and sealed.
  3. 3Sealing and caulking: all slab penetrations, control joints, and the floor-wall joint sealed.
  4. 4Vent pipe: a 3- or 4-inch PVC riser from a T-fitting in the aggregate, run through the building and out above the roofline.
  5. 5Junction box: an electrical box in the attic beside the vent pipe so a fan can be added later without new wiring.
Schematic
PassiveStack effect only — varies with weatherActiveFan-driven — consistent, verifiable reduction
Passive vs active systems. A passive system relies on natural stack effect through a vertical pipe. An active system adds a continuously running fan, producing far larger and more consistent reduction.

Process and construction sequencing

Construction stageRadon work
Sub-grade prepVerify clean aggregate depth and grading
Before slab pourSet the T-fitting, membrane, and riser stub
FramingRoute the vent pipe through chases to the attic
Rough electricalInstall the junction box adjacent to the pipe
Drywall / finishSeal penetrations, label the pipe
After occupancyTest; activate with a fan only if the result warrants it

Expected timeline

The rough-in adds hours, not days, and happens inside stages the builder is already performing. Activation later — adding a fan to an existing riser and junction box — is typically a 1–2 hour visit followed by a verification test.

What affects the cost

  • Slab area and number of risers.
  • Distance from the collection point to the roof termination.
  • Whether the aggregate layer already meets specification.
  • Coordination with the framing and electrical schedule.
  • Activation later adds the fan, electrical connection, and verification test.

What happens after occupancy

Test the finished home. A passive system alone reduces radon in many houses but not all — the stack effect that drives it is weak in mild weather. If the test comes back at or above 4.0 pCi/L, adding a fan converts the passive stack into an active system and almost always resolves it. Retest after activation, then every two years.